1.01a. This specification refers to Nova Distinctive Floors Linoleum Floating Floor. |
| |
1.01b. Installer is defined as proficient, experienced personnel assigned to install the flooring material. |
| |
1.02a. Installer must be experienced and proficient in the installation of tongue and groove floating floor materials. Installer should install flooring as per instructions provided by Nova Distinctive Floors. |
| |
1.03a. Prepare sub-floor per manufacturers� instructions in areas specified to receive Nova Linoleum flooring. |
| |
1.03b. Install-flooring material using manufacturers� recommended installation products in accordance with manufacturers� instructions. |
| |
1.03c. Finish clean and protect floor per manufacturers� recommendations. |
| |
1.04a. Flooring materials, and finishes must be delivered to the job site a minimum of 48 hours prior to installation. |
| |
2.01a. Product recommendations, and installation and maintenance instructions, are based upon Nova Distinctive Floors Linoleum Floating Floor. |
| |
2.01b. Detailed instructions on sub-floor preparation, installation and maintenance are available on the Nova Distinctive Floors website at www.novafloorings.com. |
| |
2.02a. Nova Distinctive Floors 866-576-2458 www.novafloorings.com. |
| |
2.03a. Submit product data, samples and installation and maintenance recommendations for each item specified. |
| |
2.03b. Submit two samples of 12�x12� to illustrate product shade, design and finish for approval by client or responsible party. Samples will be used as a standard by client and installer for material to be installed. |
| |
2.04a. Manufacturer will provide (20) year wear warranty for residential applications and (10) year wear warranty for commercial applications. See website for details at www.novafloorings.com. |
| |
2.05a. Nova Linoleum Floating Floor shall meet the following specifications.
- Nova Linoleum Floating Floor shall be made of 100% Linoleum and HDF (High Density Fiberboard). Thickness of the Linoleum surface shall be 2mm. HDF core shall have a thickness of 6.8mm. Acoustical cork backing shall have a thickness of 1.2mm. Overall thickness of floating floor planks shall be 10mm (3/8�).
- Tongue and groove shall be Uniclic- U.S. Patent nr. 6,006,486.
- Style: Specify name as listed on manufacturers� sample
- Physical Properties:
- Dimensions: Specify plank dimension and thickness in inches
- Standard dimensions: 12�x36�x3/8� or 12�x12�x3/8�
|
| |
3.01a. Prepare concrete or plywood sub-floor according to manufacturers� recommendations |
| |
3.01b. Conduct moisture tests to ensure that moisture emission levels are within acceptable levels. |
| |
3.01c. Provide detailed sub-floor preparation guidelines to those responsible for sub-floor preparation. |
| |
3.02a. Provide detailed manufacturers� installation instructions to floor installer. |
| |
3.02b. Conditions on site for acclimation and installation shall be maintained for 48 hours prior, during and after installation between 60� F and 75� F with relative humidity between 50% and 60%. |
| |
3.02c. Compare Floating Floor with submitted approved samples to ensure installation of the correct materials. |
| |
3.02d. Inspect materials prior installation for any manufacturing defects. |
| |
3.02e. Install Nova Linoleum Floating Floor material according to manufacturers� instructions. |
| |
3.02f. Plank pattern: The floor should be installed in a staggered joint pattern. |
| |
3.02g. Install material using floor preparation materials recommended by the manufacturer. |
| |
3.02h. After floor installation is complete, install floor transitions and base according to instructions. |
| |
3.03a. After installation, it is recommended not to clean or finish floor for 12 hours for final acclimation. After 12 hours, clean the floor according to manufacturers� maintenance guidelines. |
| |
3.03b. Nova Distinctive Floors recommends the application of Loba Supra�s finish to seal floor joints. Use only those products approved by Nova Distinctive Floors. |
| |
3.03c. Only foot traffic shall be permitted on floor for 12 hours after installation. |
| |
3.03d. Protect the floor against scratching and gouging with material suited to the type of traffic it shall be submitted to during the completion of construction/renovation. |
| |
3.03e. After completion of construction, the floor shall be cleaned according to manufacturers� instruction. |
| |
3.03f. Provide manufacturers� detailed post-installation maintenance instructions to those responsible for post-installation maintenance. |